Designing and implementing a Mitsubishi PLC-based SCADA system needs a meticulous approach. Fundamental considerations include the scope of the project, the type of data to be tracked, and the desired level of manipulation. A well-defined system architecture is crucial for ensuring efficient data collection from the field. This involves selecting